Renovating the Schoolhouse

We are so excited about the renovation project now happening at Mountain Brook!      
 
To date, there is a new roof on the school as well as significant structural improvements to the inside.  The interior has been completely stripped out and we are working on installing new windows.
 
Check out the Vision Page for simulated pictures of the renovated interior along with plans of events we hope to host once the building is complete
 

August 3, 2011

Volunteers Bill Nickel, Jim Till and Heidi Wunderlich installed the last four of the north side windows!  And that's all!  Now there is sunlight coming in from both sides just as beautiful as ever. Thank you SO much you guys for all the hard work you put in.  We are so grateful!  And thank you Foundation Members for your faithful donations that have made this possible.  Stop in and see the inside of the building at the Summer Pie Social August 27, 2011.

July 20, 2011

Volunteers Bill Nickel, Jim Till and Kim Wunderlich installed four of the north side windows!  Now there is sunlight coming in from both sides just as beautiful as ever. Thank you SO much you guys for all the hard work you put in.  We are so grateful!

June 30th, 2011

Volunteers Bill Nickel and Kim Wunderlich finished the last of the framing on the south side of the school and installed SEVEN beautiful new windows!  We are so excited to have sunlight coming into the school again!  Amanda Wunderlich also cut and edged the lawn.  Thank you SO much you guys for all the hard work you put in.  We are so grateful!

June 29th, 2011

Volunteers Bill Nickel, Kim Wunderlich and Heidi Wunderlich finished framing in the last of a bank of four windows.  They are now ready for windows to be set in.  Afterward, we put two windows in the holes just to see how they looked and for pictures.  Looking good!  New furniture was also hefted into the library building and work was done on the oak shelving to be added to the Mountain Brook Library.  Thank you to all who came and helped.  You make so much possible!  See you next Wednesday!

June 22nd, 2011

Volunteers Bill Nickel, Jim Till, and Kim Wunderlich framed in two more window spaces.  Afterward, we wanted to get a glimpse of what the new windows will look like and set one in one of the holes for a picture.  It's going to look wonderful!  Volunteers Heidi and Amanda Wunderlich sorted through oak shelving donated by Flathead County Library to later be assembled and added to the fiction shelving of the Mountain Brook Library.  Thank you to all who came in and helped.  See you next Wednesday!

June 15th, 2011

Bill Nickel did the first steps for framing in new headers for windows while volunteers Heidi and Amanda cleared the north classroom to prepare for dropping the sagging false ceiling.  The foundation would appreciate the help of more volunteers on the next Wednesday work night for this large step. 

June 8th, 2011

Volunteers cut the lawn and did some trimming around the property with our new lawnmower and weed eater.  

June 1st, 2011

Work parties are beginning again!  Volunteers Bill Nickel and Heidi Wunderlich removed all seven windows along the south wall of the schoolhouse.  The windows will be stored, some of them for art decoration when the building is complete and others to be sold as fundraisers.  If you would like to inquire about purchasing, contact Amanda.
 

Installing Last North Windows - August 3, 2011

   
Our Wish List 
Can you make one of these wishes come true?
 
WishDescriptionComplete
Trailer We need to haul off a lot of junk wood to be burned  
Backhoe We need some exploration digging done to locate some piping behind the school  
1" plywood We need to replace some rotten flooring  
Backhoe We need to do some site prep to correct some negative drain issues both at the library building and the school  
Gravel To finish off the dry well and library drainage areas  
Gravel Truck We need a truck to haul gravel for our parking lot. The gravel has already been donated.  
Licensed Electrician We need someone to look over the wiring and possibly aid in replacing  
Showing 7 items from page Wish List sorted by edit time. View more »
 
Thank you to everyone who has stepped up to the plate and helped make one of our wishes come true!  You are heroes in our eyes. 
 
If you can possibly help us with one of the wishes listed above please email us and let us know.  We would so appreciate it. 
 
Remember that all donations made to the foundation are tax deductible. 
 
Thank you!
 

Business Donor List

Business NameItem(s) donated
Pacific Steel & Recycling 2 steel supports 
Glacier Steel Discount on galvanized metal roofing 
Veilleux Construction Use of dump truck 
Western Building Center (Columbia Falls Store) Donated, delivered, and installed support beam 
Plum Creek  20 sheets of 1" plywood 
Anderson's Masonry 40 8x8x16 concrete blocks 
Raiman Tree Service Site prep with a backhoe to correct drainage issues and hauling of extra dirt 
Mountain Brook Studio (www.mountainbrookstudio.com) Beautiful pottery for silent auction fundraiser 
Keller Supply  3 new watersave toilets 
Mountain CAD Labor to unearth library septic tank and pipe. Also to backfill for us.  
Mel's Pumping Service Donated pumping the septic and replacing our T baffle. 
Flathead Concrete Products Discounted cost on riser for the tank. 
Glacier Surveying Topographic survey and location of septic tank for future reference. 
Bug Hunters Pest Control Spraying the campus at the returning customer rate. 
Montana Wildlife Studio 2 shrink wrapped prints for silent auction. 
Showing 15 items from page Business Donor List sorted by edit time. View more »